The Client, having progressed with the proposal, has received advanced wedding bookings ahead of project completion, and has requested that the proposed completion time for the Country Club development be reduced by six weeks. The client is aware that additional cost may be incurred to accelerate the work
With the aid of illustrations explain how modern methods of construction (MMC) or modular integrated construction (MiC), might be employed on the development to reduce the duration of the project, while maintaining required standards of sustainability.
Prepare a construction programme for the development up to first floor level, highlighting the work to be carried out on the existing structure and the new layout as detailed on the proposed plans. State any assumptions made.