*** READ ALL THE UPLOADED MATERIAL***

1) assignment_3.doc
2) Chapter 5 Aseessing Vulnerabilities in Protective Systems(1).pdf
3) How to write scenarios.pdf
4) Assignment 1_biometric system.doc
5 Assignment 2_Environments of Protective Systems.doc

TOPIC: The Protective System’s View of Risk

In this assignment, describe one scenario, below are the instructions.

Describe one scenario: (read the uploaded PDF “How to write scenarios”)
Scenarios describe a sequence of events about how some environmental threat “attacks” assets. The sequence of events should describe how the protective system defends assets against the threat.
Use the protective system that you described in assignment 1 which was biometric system (read the uploaded document “Assignment 1_biometric system”) and its environment that you described in assignment 2. (read the uploaded document “Assignment 2_Environments of Protective Systems”)
The assets that you want to protect. Be precise. Are you protecting something inside a space, a space within the building (e.g., a tenant premises, a store in a larger building, etc.), an entire building or structure (this might be a bridge, tunnel, transportation terminal, an entire office or apartment building, etc.), or a campus (that is, a collecting of buildings)
The threat from which you want to protect the assets.
The specific setting (the environment), for example, the building, the environmental factors that affect whether the protective system is likely to be effective. Consider where and when the threat occurs.
The events that describe how the protective system is expected to work in protecting the identified assets. This is likely to be an ordered sequence of events.
Evaluate vulnerabilities in the protective system by describing the errors of omissions and the errors of commission that are likely to limit the effective of the response. Recommend improvements. Again, consider both physical and informational components that would improve how well the system responds.

***LIST ALL SOURCES/REFERENCES, USE THE UPLOADED MATERIAL AS SOURCES, TOTAL SOURCE COUNT SHOULD NOT BE LESS THAN 2***