Business analytics

Your Group Task
Represent this proposed production pattern in Simul8. (Notes: final quality inspection is a 6 minute process, and because the mechanical installation process has been simplified, it is found that mechanical installation will take 50 minutes).

Element 1
Calculate averaged production times and orders from the data already given in the Braeheart production data and describe how the data is important.

Element 2
Build a model in Simul8. Amalgamate orders for models 3 and 4, and models 5 and 6, using the average time for construction at each workstation to simulate the processes of assembling eBikes.

Element 3
Demonstrate, using the model, if the model can cope with a production schedule of 1200 bicycles per month.