What is Chrysler Building project.

What is Chrysler Building project.

What is the difference between science and religion.

What is the difference between science and religion.

Discuss Power Generation Speed Breakers Project by using Mechatronic Systems.

Discuss Power Generation Speed Breakers Project by using Mechatronic Systems. With Design and Simulation.

Write a Control system laboratory report.

Write a Control system laboratory report.

 

Write a literature review discussing the different ways to calculate the drag coefficient of a body fully immersed in a moving fluid in 4 different ways

Write a literature review discussing the different ways to calculate the drag coefficient of a body fully immersed in a moving fluid in 4 different ways:
1. Applying empirically derived drag coefficient data from the literature.
2. Direct measurement of the force on the body / Finding the loss of momentum of the fluid.
3. Integrating the surface pressure profile.
4. Solving the flow dynamics using Computational Fluid Dynamics (CFD)
Provide a literature review of these 4 approaches to explain the method theories of each approach (to facilitate understanding for your readers, schematic diagrams are needed, but please create your own diagram, do not just copy paste).

Discuss Energy mix demand for different populations.

Discuss Energy mix demand for different populations.

Examine scientific data using both quantitative and computational methods.

Examine scientific data using both quantitative and computational methods.
Explore the characteristics and properties of engineering materials.

Discuss the environmental impact of high-rise construction and the benefits of sustainable high-rise buildings.

Discuss the environmental impact of high-rise construction and the benefits of sustainable high-rise buildings.

Discuss advance construction management.

Discuss advance construction management.

Critically evaluate the role of the Quantity Surveyor during the design phase of a modern construction project, through their use of Traditional Cost Modelling techniques, as the design evolves.

Task 1
Critically evaluate appropriate sources of data, prepare and justify the following documents for the proposed project, in appropriate formats:-
i) An outline cost estimate;
ii) A cost breakdown to primary element level.
iii) A cost breakdown to secondary element level.
iv) A detailed elemental cost plan
Evaluate the data used at each stage through value engineering techniques, to ensure costs are maintained within cost limits and so that the client receives value for their money.

Task 2
Critically evaluate the role of the Quantity Surveyor during the design phase of a modern construction project, through their use of Traditional Cost Modelling techniques, as the design evolves.